This week’s topics
System Capacity Determination
- Design capacity versus effective capacity
- Overall equipment effectiveness (OEE)
- Bottleneck identification and Theory of Constraints
- Capacity utilisation metrics
- Design Capacity and Effective Capacity - Calculating Capacity Utilization and Efficiency Rate
- What is the Theory of Constraints?
- Lec 55- Maintenance Performance Measures and OEE calculations
What you will be able to do
- 2.1 Explain the determination of system capacity in supply chain planning and control within business management.
Activity
Start with this week’s 3 videos, then: Seminar, guided reading and a short written task: explain the determination of system capacity in supply chain planning and control within business management.
Study materials
Videos
- Design Capacity and Effective Capacity - Calculating Capacity Utilization and Efficiency Rate · YouTube · Dr. Haywood · 16 min · for registered students
- What is the Theory of Constraints? · YouTube · Dr. Haywood · 15 min · for registered students
- Bottleneck Analysis to Understand Systems in Disruption (audio only) · YouTube · MIT Center for Transportation & Logistics · 30 min · for registered students
Further resources
- Operations Management (Fanshawe), ch. 8: Capacity Planning & Management · Reading · Other, textbook chapter; PDF pp. 331–376 · for registered students
- MIT OCW 15.760B Introduction to Operations Management (Spring 2004), Capacity · PDF · MIT OpenCourseWare, slides · for registered students
- MIT OCW 15.769 Operations Strategy (Fall 2010), Capacity strategy · PDF · MIT OpenCourseWare, slides · for registered students
Materials marked “for registered students” open in the student portal, which is set up as soon as you receive final acceptance.